UHT plant, Nilai
Kelip Dairies
6 × 12 m³ jacketed buffer tanks, SS316L, with CIP spray balls and load cells
The old tanks had to come out and the new ones go in during a 9-day Hari Raya shutdown. We pre-assembled pipe spools in Rawang, trial-fitted them against a laser scan of the site, and worked two shifts.
- shutdown, finished with 20 hours spare
- 9 days
- CIP cycle per tank
- 38 → 22 min
- punch items at FAT
- 0
“They showed up with the spools already numbered to our P&ID. My team only had to bolt them in.”